Two paint jobs can use the same product and look completely different in three years. The difference is what happened before the first coat: how much loose material came off, how the edges were sanded, and what got primed first.
Exterior work in this state has a season. Coating needs surface temperature and dew point inside a range, and that window closes early in the fall. Interior work runs year round, which is why scheduling matters more here than elsewhere.
-
Prep Included
Scraping, sanding, caulking, priming quoted
-
Repairs Before Paint
Rotted trim fixed, not covered over
-
Season Scheduling
Exterior booked inside the coating window